The Para 2 of Annexure 5.9 at Page 174 of Indian Railways Track Machine Manual - 2000 may be revised to read as under:

           

 

2. Life of the machine in terms of gross units of work done, unit cost of the machine, weightage for different types of machines for proportionate distribution of overheads on technical and general supervision and works units between IOHs are as follows:

 

S. N.

Type of machine

Life of machines (Gross Units of work done)

(Km)

Work Units between POH

 

(Km)

Work units between IOH (2 IOHs between POH)

(Km)

 

Weightage

1

UT

2500

1250

425

1

2

UNO

4500

2250

750

1

3

DUO

6000

3000

1000

1

4

CSM

7500

3750

1250

1

5

UNIMAT

10000 T/Outs

5000 T/outs

1650 T/outs

1

6

Portal Crane of 3 sets

500

-

250

0.5

7

TRT

1500

750

250

3

8

BCM

1000

500

175

1.5

9

DTS

10000

5000

1700

1

10

BRM

10000

5000

1700

0.8

11

RGM

17500

8750

2925

1

12

SBCM

3000

1500

500

1.5

13

Multipurpose Tamping Machines

7500

3750

1250

1

14

Tamping Express (09-3X)

11000

5500

1850

1

15

Points & Crossing changing Machine (T-28)

1000

500

175

1

 

Authority: Board’s office’s letter No. 91/Track-III/TK/24 vol. V dated 12.12.2006.